Search
Login











    ►Standard Products
    ►Technical Resources  
    ►Project Login
    ►Contact Us

    

Skids & Modules Minimize
Factory Acceptance Testing Minimize

Each system is operated and fully tested at the factory to pre-qualify equipment prior to shipment. The goal of our FAT is to dramatically reduce on-site commissioning and validation effort.
The in-house testing facility is fully equipped to provide plant steam, clean steam, D.I. water, instrument air and 575 volt power. These utilities ensure our capability to perform full system tests.

Copyright 2008 Turn-Key Modular Systems Inc. Terms Of UsePrivacy Statement